USS LST Crew #4721 Naval Cover 1944 Censored WWII Sailors Mail ATB Camp BRADFORD

£19.00 Buy It Now, £1.90 Shipping, 30-Day Returns, eBay Money Back Guarantee
Seller: nalwife ✉️ (28,502) 99.9%, Location: Weaverville, North Carolina, US, Ships to: WORLDWIDE & many other countries, Item: 392990451881 USS LST Crew #4721 Naval Cover 1944 Censored WWII Sailors Mail ATB Camp BRADFORD.

USS LST Crew #4721 Naval Cover 1944 Censored WWII Sailors Mail ATB Camp BRADFORD

It was sent 8 Nov 1944. It was franked with stamp "Free". It was sent from Thelma Reese to Washington 7, DC.

This envelope is in good, but not perfect condition. Please look at the scan and make your own judgement. 

Member USCS #10385 (I also earned the stamp collecting merit badge as a boy!). Please contact me if you have specific cover needs. I have thousands for sale, including; navals (USS, USNS, USCGC, Coast Guard, ship, Maritime), military posts, event, APO, hotel, postal history, memoribilia, etc. I also offer approvals service with FREE SHIPPING to repeat USA customers.

Landing Ship, Tank (LST), or tank landing ship, is the naval designation for ships first developed during World War II (1939–1945) to support amphibious operations by carrying tanks, vehicles, cargo, and landing troops directly onto shore with no docks or piers. This enabled amphibious assaults on almost any beach.

The LST had a highly specialized design that enabled ocean crossings as well as shore groundings. The bow had a large door that could open, deploy a ramp and unload U.S. or allied vehicles. The LST had a special flat keel that allowed the ship to be beached and stay upright. The twin propellers and rudders had protection from grounding. The LSTs served across the globe during World War II including in the Pacific War and in the European theatre.

The first tank-landing ships were built to British requirements by converting existing ships; the UK and the US then collaborated upon a joint design. The British ships were used in late 1942 during the Allied invasion of Algeria, by 1943 LSTs participated in the invasion of Sicily and mainland Italy. In June 1944 they were part of the huge invasion fleet for the Normandy landings.

Over 1,000 LSTs were laid down in the United States during World War II for use by the Allies; the United Kingdom and Canada produced eighty more.[1][2][3]

Contents

1 LST Mk.1

2 LST Mk.2

2.1 Development

2.2 Design

2.3 Production

2.4 Modifications

3 LST Mk.3

3.1 Design

3.2 Propulsion

3.3 Modifications for landing craft

3.4 Variants

4 Service in World War II

5 Post-war developments

5.1 United States

5.2 United Kingdom

5.2.1 Commercial ferry use

5.2.2 Army service

5.2.3 Aviation training

6 Notable incidents

7 Last WWII survivors

8 Modern developments

9 Cultural references

9.1 Literature

10 See also

11 References

11.1 Notes

11.2 Bibliography

12 External links

LST Mk.1

HMS Bachaquero

Bren Gun Carriers being loaded at Bone Harbour through the bow doors of HMS Bachaquero

Class overview

Name: LST Maracaibo class

Builders: Furness Shipbuilding Company, Haverton Hill-on-Tees

Operators: Royal Navy

Succeeded by: Boxer

Completed: 3 (Misoa, Tasajera & Bachaquero)

General characteristics

Tonnage: 4,800 long tons (4,877 t) GRT

Length: 382 ft (116 m)[4]

Beam: 64 ft

Draught:

Fully laden :

15 ft (4.6 m) aft

4 ft (1.2 m) forward

Ramps: Double hinged ramp, effective length of 100 ft (30 m)

Propulsion: Reciprocating steam engine, 2 shafts, 3,000 shp

Capacity: 18 × 30 ton tanks or 22 × 25 ton tanks or 33 × 3-ton trucks[4]

Troops: Berths for 217 troops[4]

Complement: 98 Combined Operations personnel

Armament:

1 × twin 40 mm gun

6 × 20 mm guns[4]

3 × Lewis guns

2 × 4 in (100 mm) smoke mortars[4]

Notes: Equipment: 2 × 50 ton derrick cranes

HMS Thruster FL9083.jpg

HMS Thruster

Class overview

Name: LST (1) Boxer class

Builders: Harland and Wolff

Operators: Royal Navy

Preceded by: Maracaibo

Succeeded by: LST (2)

Completed: 3 (Boxer, Bruiser, Thruster)

General characteristics

Type: Landing Ship, Tank Mark I

Displacement:

3,620 long tons (3,678 t) standard

5,410 long tons (5,497 t) full load

Length: 400 ft (120 m)

Beam: 49 ft (15 m)

Draught: 14 ft 6 in (4.42 m)

Propulsion: Steam turbines, 2 shafts, 7,000 shp (5,200 kW)

Speed:

18 knots (33 km/h; 21 mph) laden to beaching draught

16.5 knots (30.6 km/h; 19.0 mph) at deep

Range: 9,000 nmi (17,000 km; 10,000 mi) at 14 kn (26 km/h; 16 mph)

Capacity: 13 Churchill tanks or 20 medium tanks, 27 vehicles on upper deck, 193 men

Complement: 169

Armament:

4 × QF 2 pdr

8 × 20 mm Oerlikon

2 × 4-inch smoke mortars

Notes: Equipment: 1 × 40 ton crane[5]

The British evacuation from Dunkirk in 1940 demonstrated to the Admiralty that the Allies needed relatively large, ocean-going ships that could handle shore-to-shore delivery of tanks and other vehicles in amphibious assaults upon the continent of Europe. As an interim measure, three 4,000- to 4,800-GRT tankers, built to pass over the restrictive bars of Lake Maracaibo, Venezuela, were selected for conversion because of their shallow draft. Bow doors and ramps were added to these ships, which became the first tank landing ships, LST (1): HMS Misoa, Tasajera and Bachaquero.[4] They later proved their worth during the invasion of Algeria in 1942, but their bluff bows made for inadequate speed and pointed out the need for an all-new design incorporating a sleeker hull.

The first purpose-built LST design was HMS Boxer.[dubious – discuss] It was a scaled-down design from ideas penned by Prime Minister Winston Churchill. In order that it could carry 13 Churchill infantry tanks, 27 other vehicles and nearly 200 men (in addition to the crew) at a speed of 18 knots, it could not have a shallow draught sufficient for easy unloading. As a result, each of the three (Boxer, Bruiser, and Thruster) ordered in March 1941 had a very long ramp stowed behind the bow doors.[6] Boxer was converted to a 'Fighter Direction Ship' for the invasion of Normandy.

The U.S. were to build seven LST (1) but in light of the problems with the design and progress with the LST Mark II the plans were canceled. Construction of the LST (1)s took until 1943 and the first US LST (2) was launched before them.[7]

LST Mk.2

LST-942

LST-942 underway soon after completion, late in 1944

Class overview

Name: LST (2)

Operators:

 United States Navy

 Royal Navy

Canadian Naval Ensign (pre 1957) Royal Canadian Navy

Subclasses:

LST-1 class

LST-491 class

LST-542 class

Completed: c. 1000

General characteristics

Displacement:

1,780 long tons (1,809 t) light

3,880 long tons (3,942 t) full load

Length: 327 ft 9 in (99.90 m)

Beam: 50 ft (15 m)

Draught:

Unloaded :

3 ft 4 in (1.02 m) bow

7 ft 6 in (2.29 m) stern

Loaded :

8 ft 2 in (2.49 m) bow

14 ft 1 in (4.29 m) stern

Propulsion: 2 × General Motors 12-567 diesel engines, two shafts, twin rudders

Speed: 12 knots (14 mph; 22 km/h)

Boats & landing

craft carried: 2 to 6 LCVPs

Troops: About 140 officers and other ranks

Complement: 8 to 10 officers, 100 to 115 enlisted

Armament:

1 × 3 in (76 mm) gun

6 × 40 mm Bofors guns

6 × 20 mm guns

2 × .50 cal (12.7 mm) machine guns

4 × .30 cal (7.62 mm) machine guns

Development

At their first meeting at the Atlantic conference in Argentia, Newfoundland, in August 1941, President Franklin D. Roosevelt and Prime Minister Winston Churchill confirmed the Admiralty's views. In November 1941, a small delegation from the Admiralty arrived in the United States to pool ideas with the United States Navy's Bureau of Ships with regard to development of ships and the possibility of building further Boxers in the US.[8] During this meeting, it was decided that the Bureau of Ships would design these vessels. As with the standing agreement, these ships would be built by the US so British shipyards could concentrate on building vessels for the Royal Navy. The specifications called for vessels capable of crossing the Atlantic, and the original title given to them was "Atlantic Tank Landing Craft" (Atlantic (T.L.C.)). Calling a vessel 300 ft (91 m) long a "craft" was considered a misnomer and the type was re-christened "Landing Ship, Tank (2)", or "LST (2)".

The LST (2) design incorporated elements of the first British LCTs from their designer, Sir Rowland Baker, who was part of the British delegation. One of the elements provided for sufficient buoyancy in the ships' sidewalls so that they would float the ship even when the tank deck was flooded.[8] The LST (2) gave up the speed of HMS Boxer, at only 10 knots, but carried a similar load while drawing only three feet forward when beaching.

Design

Tank landing ship technical diagram 1959.png

Within a few days, John C. Niedermair of the Bureau of Ships sketched out an awkward looking ship that proved to be the basic design for the more than 1,000 LST (2) that were built during World War II. To meet the conflicting requirements of deep draft for ocean travel and shallow draft for beaching, the ship was designed with a large ballast system that could be filled for ocean passage and pumped out for beaching operations.[9] An anchor and mechanical winch system also aided in the ship's ability to pull itself off the beach. The rough sketch was sent to Britain on 5 November 1941 and accepted immediately. The Admiralty then requested that the United States build 200 "LST (2)" for the Royal Navy under the terms of lend-lease.

The preliminary plans initially called for an LST 280 feet (85 m) in length; but, in January 1942, the Bureau of Ships discarded these drawings in favor of specifications for a ship 290 feet (88 m) long. Within a month, final working plans were developed that further stretched the overall length to 328 feet (100 m) and called for a 50-foot (15 m) beam and a minimum draft of 3.8 feet (1.2 m). This scheme distributed the ship's weight over a greater area, enabling her to ride higher in the water when in landing trim. The LST could carry a 2,100 short tons (1,900 t) load of tanks and vehicles. The larger dimensions also permitted the designers to increase the width of the bow door opening and ramp from 12 to 14 feet (3.7 to 4.3 m) in order for it to be able to accommodate most Allied vehicles. As the dimensions and weight of the LST increased, steel plating thickness increased from 1⁄4-inch (6.4 mm) to 3⁄8-inch (9.5 mm) on the deck and sides, with 1-inch-thick (25 mm) plating under the bow.[10] By January 1942, the first scale model of the LST had been built and was undergoing tests at the David Taylor Model Basin in Washington, D.C.

Provisions were made for the satisfactory ventilation of the tank space while the tank motors were running, and an elevator was provided to lower vehicles from the main deck to the tank deck for disembarking. In April 1942 a mock-up of the well-deck of an LST was constructed at Fort Knox, Kentucky to resolve the problem of ventilation within the LST well-deck. The interior of the building was constructed to duplicate all the features found within an actual LST. Being the home to the Armored Force Board, Fort Knox supplied tanks to run on the inside while Naval architects developed a ventilation system capable of evacuating the well-deck of harmful gases. Testing was completed in three months. This historic building remains at Fort Knox today.[11]

Early LST operations required overcoming the 18th-century language of the Articles for the Government of the United States Navy: "He who doth suffer his ships to founder on rocks and shoals shall be punished..."[12] There were some tense moments of concept testing at Quonset, Rhode Island, in early 1943 when designer Niedermair encouraged the commanding officer of the first U.S. LST to drive his ship onto the beach at full speed of 10 knots (12 mph; 19 km/h).[10]

Production

USS LST-983 with LST-601 in the background, launches a Marine LVTP-5 for a waterborne landing. When carrying amphibious tractors, an LST could land her payload from offshore without beaching.

USS LST-325 (left) and USS LST-388 unloading while stranded at low tide during the Normandy Invasion in June 1944. Note: propellers, rudders, and other underwater details of these LSTs; 40 mm single guns; "Danforth" style kedge anchor at LST-325's stern.

USS LST-742 on 13 October 1950 at Wolmi-do island, Incheon Harbor, South Korea, loading supplies for the upcoming Wonsan invasion

A GM EMD 12-567ATLP diesel engine as installed in LST 393 (Landing Ship Tank), located in Muskegon, Michigan, July 2017. The engines were rated at 900 HP (each) at 744 RPM.

In three separate acts dated 6 February 1942, 26 May 1943, and 17 December 1943, Congress provided the authority for the construction of LSTs along with a host of other auxiliaries, destroyer escorts, and assorted landing craft. The enormous building program quickly gathered momentum. Such a high priority was assigned to the construction of LSTs that the previously laid keel of an aircraft carrier was hastily removed to make room for several LSTs to be built in her place. The keel of the first LST was laid down on 10 June 1942 at Newport News, Virginia, and the first standardized LSTs were floated out of their building dock in October. Twenty-three were in commission by the end of 1942.

USS LCT-749 launched from on board USS LST-767, off Okinawa on 3 April 1945. The LCT had been put aboard the LST at Pearl Harbor on 10 December 1944.

The LST building program was unique in several respects. As soon as the basic design had been developed, contracts were let and construction was commenced in quantity before the completion of a test vessel. Preliminary orders were rushed out verbally or by telegrams, telephone, and air mail letters. The ordering of certain materials actually preceded the completion of design work. While many heavy equipment items, such as main propulsion machinery, were furnished directly by the Navy, the balance of the procurement was handled centrally by the Material Coordinating Agency—an adjunct of the Bureau of Ships—so that the numerous builders in the program would not have to bid against one another. Through vigorous follow-up action on materials ordered, the agency made possible the completion of construction schedules in record time.

The need for LSTs was urgent, and the program enjoyed a high priority throughout the war. Since most shipbuilding activities were located in coastal yards that were mainly used for construction of large, deep-draft ships, new construction facilities for the LSTs were established along inland waterways, some converted from heavy-industry plants, such as steel fabrication yards. Shifting the vessels was complicated by bridges across waterways, many of which were modified by the Navy to permit passage. A dedicated Navy "Ferry Command" orchestrated the transportation of newly constructed ships to coastal ports for final fitting out. Of the 1,051 LSTs built during the war, 670 were supplied by five "cornfield shipyards" in the Middle West. Dravo Corporation's facility at Neville Island, Pennsylvania, designated the lead shipyard for the project, built 145 vessels and developed fabrication techniques that reduced construction time and costs at all of the LST shipyards. The Missouri Valley Bridge & Iron Co. built the most LSTs of any shipyard, with 171 constructed at Evansville, Indiana.[13] Chicago Bridge and Iron's shipyard in Seneca, Illinois, launched 156 ships and was specifically chosen because of their reputation and skills, particularly in welding. The American Bridge Company in Ambridge, Pennsylvania, built 119.

Modifications

By 1943, the construction time for an LST had been reduced to four months. By the end of the war, this had been cut to two months. Considerable effort was expended to hold the ship's design constant, but, by mid-1943, operating experience led to the incorporation of certain changes in the new ships.

The LST-491 class replaced the elevator installed in the original LST-1 class, to transfer equipment between the tank deck and the main deck, with a ramp that was hinged at the main deck. This allowed vehicles to be driven directly from the main deck onto the tank deck and then across the bow ramp to the beach or causeway, speeding the process of disembarkation.

Changes in the later LST-542 class included the addition of a navigation bridge; the installation of a water distillation plant with a capacity of 4,000 gallons per day; the removal of the tank deck ventilator tubes from the center section of the main deck; the strengthening of the main deck in order to carry a smaller Landing Craft Tank (LCT); and an upgrade in armor and armament, with the addition of a 3"/50 caliber gun.

LST Mk.3

Class overview

Name: LST (3)

Builders: R & W. Hawthorn, Leslie & Co. Ltd, Harland and Wolff, Swan, Hunter & Wigham Richardson Ltd, Vickers-Armstrongs

Operators:

 Royal Navy

 Royal Australian Navy

 Hellenic Navy

 Royal Netherlands Navy

 Indian Navy

Planned: 119

Completed:

UK:

31 × LST (3)

2 × LST (C)

2 × LST (Q)

Canada:

26 × LST (3)

Cancelled: 40 + 6 scrapped before completion

Active: 0

Preserved: 0

General characteristics

Displacement:

2,140 tons light

4,980 long tons (5,060 t) full load

Length: 347 ft (106 m) o/a

Beam: 55 ft 2 in (16.81 m)

Draught:

Loaded :

4 ft 7 in (1.40 m) bow

11 ft 6 in (3.51 m) stern

Ramps: 23 feet by 14 feet ramp

Propulsion: Twin screws, steam reciprocating engines, 5,500 hp (4,100 kW), 10 ft (3.0 m) propeller

Speed: 13 knots (24 km/h; 15 mph)

Capacity: 10 tanks plus 15 vehicles

Troops: 13 officers and 150 men

Complement: 14 officers and 90 men

Armament: 8 × 20 mm Oerlikon for A/A defence on some ships

Design

The LST (2) design was successful and production extensive, but there was still a need for more LSTs for British operations. As such, it was decided to build a further 80 of the ships in the UK and Canada to be available in the spring of 1945.

The British Staff drew up their own specification, requiring that the ship:

Be able to embark and disembark tanks, motor transport, etc., on beaches of varying slopes; and amphibians and DD Sherman tanks into deep water

Carry five Landing Craft Assault (LCA), or similar craft, and one LCT (5) or LCT (6) on the upper deck, in place of transport, and, as an alternative to the LCT (5), two NL pontoon causeway to be carried; the LCT (5) and NL pontoon causeways to be capable of launching directly from the upper deck.

To carry 500 tons of military load and to beach with that and sufficient fuel and stores for a 1,000 mi (1,600 km) return journey at 10 knots (19 km/h), on draughts 4 ft 6 in (1.37 m) forward and 11 ft 6 in (3.51 m) aft.

To carry a load of sixty tons over the main ramp and ten tons over the vehicle ramp (i.e., the 50 ft (15 m) ramp from the upper deck to the bow door. After trials, this was removed from some vessels)

To be fitted for operations in the tropics and in cold climates

Two major problems made a redesign necessary. The preferred light weight medium-speed (locomotive type) Electro-Motive Diesel 12-567 diesel engines were not immediately available. Staff wanted more power and higher speeds if possible, which the EMD engines could have provided. However, the only engines available were very heavy steam reciprocating engines from frigates that had been cancelled. These delivered two and a half times the power of the diesels. So large were they that significant changes had to be made to accommodate them. Lack of welded construction facilities meant that the hull had to be riveted. This combination of heavy hull and heavy engines meant that speed was only 3 knots faster than the LCT (2).

At the same time, other improvements were made—as well as simplifications required so most of the structure could be assembled with rivets. The cutaway hard chine that had been dropped in the American version of the Mark 2 vessels was restored. The tank deck, which was above the waterline, was made parallel to the keel, there was to be no round down to the upper deck, and the ship was enlarged to accommodate the more bulky machinery.

Provision was made for carrying the British Landing Craft Assault (LCA) in gravity davits, instead of American assault craft. Provision was also made for carrying Landing Craft Tank (LCT) and Landing Craft Mechanized (LCM), and NL pontoon causeways.

When the design commenced, engineers knew that the beaches where the ships were expected to land would be very flat, but it was not possible to produce a satisfactory vessel with a 3 ft (0.91 m) draught forward, and very little keel slope, so the 1 in 50 keel slope was maintained. It was known that the 1:50 slope would often result in the LST grounding aft on a shallow beach, resulting in the vehicles being discharged into comparatively deep water.

Various methods had been investigated to overcome the problem, but heavy grounding skegs and the N.L. pontoon causeways were finally accepted as standard; the pontoon causeways were formed of pontoons 7 ft (2.1 m) × 5 ft × 5 ft (1.5 m), made up into strings and rafts. When offloading, the rafts were secured to the fore end of the ship, and the load discharged directly onto the shore, or towed on the raft to the shore.

The ships were fitted out for service in both very cold and tropical conditions. The accommodation provided for both crew and army personnel was greatly improved compared with LST (2). The main hazard, apart from enemy action, was fire on the tank deck. Fire sprinklers were provided, but the water drenching system installed in later American vessels could not be provided.

The bow door arrangements were similar to the LST (2), but the design arranged the bow ramp in two parts in an attempt to increase the number of beaches where direct discharge would be possible. The machinery for operating the bow doors and ramp were electrical, but otherwise, steam auxiliaries replaced the electrical gear on the LST (2).

The general arrangements of the tank deck were similar, but the design increased headroom and added a ramp to the top deck, as in later LST (2)s. Provision was made for carrying LCA on gravity davits instead of the American built assault boats. The arrangements were generally an improvement over the LST (2), but suffered from a deeper draught, and, to some extent, from the haste of construction.

The first orders were placed in December 1943 with British builders, and 35 with Canadian builders. Swan Hunter delivered the first ships in December 1944. During 1944, follow up orders were placed in Canada for a further 36. These programmes were in full swing when the war ended, but not all vessels were completed.

The ships were numbered numbers LST-3001 to LST-3045 and LST-3501 to LST-3534. LST−3535 and later were cancelled.

Fifteen 40-ton tanks or 27 25-ton tanks could be carried on the tank deck with an additional fourteen lorries on the weather deck.[7]

Propulsion

Steam was supplied by a pair of Admiralty pattern 3-drum water-tube type boilers, working at 225 pounds per square inch. The main engines were of the 4-cylinder triple expansion 4-crank type, balanced on the Yarrow-Tweedy-Slick system, the cylinders being as follows:

High pressure 18.5 in diameter

Medium pressure 31.0 in diameter

Forward low pressure 38.5 in diameter

Aft low pressure 38.5 in diameter

The common stroke was 30 inches (760 mm). The piston and slide valve rods were all fitted with metallic packing to the stuffing boxes, and all pistons fitted with packing rings and springs. The high-pressure valve was of the piston type, whilst the remaining ones were of the balanced type. The main engines were designed to develop 2,750 hp (2,050 kW) at 185 rpm continuously.

With the ships being twin screw, the engines were fitted with a shaft coupling to the crank shaft at the forward end, allowing the engine to be turned end to end to suit either port or starboard side fitting.

Modifications for landing craft

When the LST (3)s were ordered, the LST (2) programme was in full swing, and similar arrangements were made to enable the LSTs to carry the 112 feet (34 m) long LCT5 or LCT6 that were being built in America for the Royal Navy.

The LCT needed lifting onto the deck of the ship, being carried on wedge-shaped support blocks; at the time of launching she was set down on the "launch ways" by simply slacking off bolts in the wedge blocks, allowing the launch way to take the weight. To carry out a launch, the LST was simply heeled over about 11 degrees by careful flooding of tanks in the hull. The height of the drop was about 10 ft (3.0 m), and immediately after the launch the craft's engines were started and they were ready for operation.

This method was used for moving LCT5s from Britain to the Far East, although there seems to be no reference to LST (3)s being used, most being completed late in or after the war.

Even at the end of the war there was a need for more ships able to carry minor landing craft, and two of the LST (3)s then completing were specially fitted to carry LCM (7). These craft, which were 58 ft (18 m) long and weighed about 28 tons, were carried transversely on the upper deck of the ship. They were hoisted on by means of a specially fitted 30-ton derrick; This 30-ton derrick replaced a 15-ton derrick, two of which were the standard fit of the LST (3). The 30-ton derrick was taller and generally more substantial than the 15 ton one.

The LCM (7)s were landed on trolleys fitted with hydraulic jacks. These ran on rails down each side of the deck, and were hauled to and fro by means of winches. The stowage was filled from fore to aft as each craft was jacked down onto fixed cradles between the rails. The ships completed to this standard were LST-3043/HMS Messina, and LST-3044/HMS Narvik. While these ships were able to carry LCMs, they were only able to carry out loading and unloading operations under nearly ideal weather conditions, and therefore could not be used for assault operations; they also lacked the facilities to maintain the landing craft (which the Dock Landing Ships provided).

The Landing Craft Assault were wooden-hulled vessels plated with armour, 41 ft 6 in (12.65 m) long overall, 10 ft (3.0 m) wide, and displacing 13 tons fully loaded. Draught was 2 ft 3 in (0.69 m), and normal load was 35 troops with 800 lb (360 kg) of equipment. A pair of Scripps marine conversions of Ford V8 engines gave it speeds of 11 knots (20 km/h) unloaded, 8 knots (15 km/h) service speed, 3 knots (5.6 km/h) on one engine. Range was 50–80 miles on 64 gallons. Armament was typically a Bren light machine gun aft; with two Lewis Guns in a port forward position.

The LCM (7)s that were carried on the LST (2) were considerably larger, 60 ft 3 in (18.36 m) in length, 16 ft (4.9 m) beam, with a hoisting weight of 28 tons, full load displacement of 63 tons. Beaching draught was 3 ft 8 in (1.12 m), and propulsion was provided by a pair of Hudson Invader petrol engines, later replaced with Grays diesels, both sets providing 290 bhp (220 kW), giving a speed of 9.8 knots (18.1 km/h).

The main requirement of the design was to carry a 40-ton Churchill tank or bulldozer at 10 knots (19 km/h). 140 had been completed when the war ended, and some saw service through to the 1970s.

Variants

Some LST (3)s were converted to LST (A) (A for "assault") by adding stiffening so they could safely carry the heaviest British tanks.

Two LST (3)s were converted to command vessels, LST (C): LST 3043 and LST 3044. Post war they became HMS Messina (L112) and HMS Narvik (L114). They were better armed with ten 20 mm Oerlikons and four 40 mm Bofors.

Two LST (3)s were converted during building into Headquarters command ships LST (Q). These were L3012, which became L3101 (and later HMS Ben Nevis) and LST 3013, which became LST 3102, and then HMS Ben Lomond. They acted as LST "mother ships", similar in most aspects to American ships based on the LST (2) hull. They had two Quonset huts erected on the main deck to accommodate 40 officers. Berths on the tank deck berthed an extra 196 men. A bake shop and 16 refrigeration boxes for fresh provisions augmented the facilities normally provided for the crew. Four extra distilling units were added, and the ballast tanks were converted for the storage of fresh water.

Service in World War II

U.S. LSTs carrying the Australian 26th Brigade from Morotai Island to Tarakan Island in April 1945

At the Armor Training School in Ft. Knox, Kentucky, buildings were erected as exact mock-ups of an LST. Tank crews in training learned how to maneuver their vehicles onto, in and from an LST with these facilities. One of these buildings has been preserved at Ft. Knox for historic reasons and can still be seen.

From their combat début in the Solomon Islands in June 1943 until the end of the hostilities in August 1945, the LSTs performed a vital service in World War II. They participated in the invasions of Sicily (Operation Husky), Italy, Normandy, and southern France in the European Theater and were an essential element in the island-hopping campaigns in the Pacific that culminated in the liberation of the Philippines and the capture of Iwo Jima and Okinawa.

Despite the large numbers produced, LSTs were a scarce commodity and Churchill describes the difficulty in retaining sufficient LSTs in the Mediterranean for amphibious work in Italy, and later the logistics of moving large numbers to the eastern theatres, while still supplying the large armies in Europe.

The LST proved to be a remarkably versatile ship. A number of them were converted to become landing craft repair ships (ARL). In this design, the bow ramp and doors were removed, and the bow was sealed. Derricks, booms, and winches were added to haul damaged landing craft on board for repairs, and blacksmith, machine, and electrical workshops were provided on the main deck and tank deck.

LSTs putting cargo ashore on one of the invasion beaches, at low tide during the first days of the Invasion of Normandy in June, 1944. Barrage balloons are overhead and a US Army "half-track" convoy is forming up on the beach.

Thirty-eight LSTs were converted to serve as small hospital ships and designated LSTH. They supplemented the many standard LSTs, which removed casualties from the beach after landing tanks and vehicles. LSTs had brought 41,035 wounded men back across the English Channel from Normandy by D-Day+114 (28 September 1944).[14] Other LSTs, provided with extra cranes and handling gear, were used exclusively for replenishing ammunition. They possessed a special advantage in this role, as their size permitted two or three LSTs to go simultaneously alongside an anchored battleship or cruiser to accomplish replenishment more rapidly than standard ammunition ships.

USS LST-906, with US Army Air Force L-4 Grasshopper on her flight deck being prepared for take-off. Note additional L-4 type aircraft stowed alongside the deck.

Three LST (2) were converted into British "Fighter Direction Tenders" (FDT), swapping their landing craft for Motor Launches[15] and outfitted with AMES Type 11 and Type 15 fighter control radar to provide Ground-controlled interception (GCI) coverage for air defence of the D-Day landing areas. Of these ships, HMS FDT 216 was stationed off Omaha and Utah beaches, HMS FDT 217 was allocated Sword, Juno, and Gold beaches. HMS FDT 13 was used for coverage of the overall main shipping channel. In the period 6 June to 26 June Allied fighters controlled by the FDTs resulted in the destruction of 52 enemy aircraft by day, and 24 enemy aircraft by night.[16]

USS LST-776 with Brodie system front view during testing 1943

In the latter stages of World War II, some LSTs were fitted with flight decks that could launch small observation planes during amphibious operations.[17] These were USS LST-16, USS LST-337, USS LST-386, USS LST-525, LST-776, and USS LST-906. Two others (USS LST-393 and USS LST-776) were fitted with the Brodie System for take off and landing.

It has been estimated that, in the combined fleets assembled for the war on Japan, the tonnage of landing ships, excluding landing craft, would have exceeded five million tons and nearly all built within four years.

Throughout the war, LSTs demonstrated a remarkable capacity to absorb punishment and survive. Despite the sobriquets "Large Slow Target" and "Large Stationary Target," which were applied to them by irreverent crew members, the LSTs suffered few losses in proportion to their number and the scope of their operations. Their brilliantly conceived structural arrangement provided unusual strength and buoyancy; HMS LST 3002 was struck and holed in a post-war collision with a Victory ship and survived. Although the LST was considered a valuable target by the enemy, only 26 were lost due to enemy action, and a mere 13 were the victims of weather, reef, or accident. A total of 1,152 LSTs were contracted for in the great naval building program of World War II, but 101 were cancelled in the fall of 1942 because of shifting construction priorities. Of 1,051 actually constructed, 113 LSTs were transferred to Britain under the terms of Lend-Lease, and four more were turned over to the Greek Navy. Conversions to other ship types with different hull designations accounted for 116.

Post-war developments

United States

USS Graham County (LST-1176) beached at Vieques, Puerto Rico in 1964

Embarked troops on the Greek LST Lemnos (L-158) ex-USS LST-36, around 1956

The end of World War II left the Navy with a huge inventory of amphibious ships. Hundreds of these were scrapped or sunk, and most of the remaining ships were put in "mothballs" to be preserved for the future. Additionally, many of the LSTs were demilitarized and sold to the private sector, along with thousands of other transport ships, contributing to a major downturn in shipbuilding in the United States following the war. Many LSTs were used as targets in aquatic nuclear testing after the war, being readily available and serving no apparent military applications. World War II era LSTs have become somewhat ubiquitous, and have found a number of novel commercial uses, including operating as small freighters, ferries, and dredges. Consequently, construction of LSTs in the immediate post-war years was modest. LST-1153 and LST-1154, commissioned respectively in 1947 and 1949, were the only steam-driven LSTs ever built by the Navy. They provided improved berthing arrangements and a greater cargo capacity than their predecessors.

The success of the amphibious assault at Inchon during the Korean War showed the utility of LSTs once again. This was in contrast with the earlier opinion expressed by many military authorities that the advent of the atomic bomb had relegated amphibious landings to a thing of the past. During the Korean War a number of LSTs were converted to transport the much needed, but slow and short range LSU from the United States to the Korean theater of war using the piggy-back method. After arrival the LSU was slid off sideways from the LST.[18] Additionally, LSTs were used for transport in the building of an Air Force base at Thule, Greenland during the Korean War. Fifteen LSTs of what were later to be known as the Terrebonne Parish class were constructed in the early 1950s. These new LSTs were 56 feet (17 m) longer and were equipped with four, rather than two, diesel engines, which increased their speed to 15 knots (28 km/h; 17 mph). Three-inch 50-caliber twin mounts replaced the old twin 40-millimeter guns, and controllable pitch propellers improved the ship's backing power. On 1 July 1955, county or, in the case of Louisiana, parish names were assigned to many LSTs, which up to then had borne only a letter-number hull designation.

In the late 1950s, seven LSTs of the De Soto County class were constructed. These were an improved version over earlier LSTs, with a high degree of habitability for the crew and embarked troops. Considered the "ultimate" design attainable with the traditional LST bow door configuration, they were capable of 17.5 knots (32.4 km/h; 20.1 mph).

United Kingdom

Commercial ferry use

In 1946 a brand new concept of transport was developed in the UK. It was during World War II that a few experienced men recognised the great potential of landing ships and craft. The idea was simple; if it was possible to drive tanks, guns and lorries directly onto a ship and then drive them off at the other end directly onto a beach, then theoretically the same landing craft could be used to carry out the same operation in the civilian commercial market, providing there were reasonable port facilities. From this idea grew the worldwide roll-on/roll-off ferry industry of today. In the period between the wars Lt. Colonel Frank Bustard formed the Atlantic Steam Navigation Company, with a view to cheap transatlantic travel. This never materialised, but during the war he observed trials on Brighton Sands of an LST in 1943 when its peacetime capabilities were obvious.

In the spring of 1946 the company approached the Admiralty with a request to purchase three of these vessels. The Admiralty were unwilling to sell, but after negotiations agreed to let the ASN have the use of three vessels on bareboat charter at a rate of £13 6s 8d per day. These vessels were LSTs 3519, 3534, and 3512. They were renamed Empire Baltic, Empire Cedric, and Empire Celtic, perpetuating the name of White Star Line ships in combination with the "Empire" ship naming of vessels in government service during the war.

The chartered vessels had to be adapted for their new role. First the accommodation on board had to be improved, and alterations in the engine and boiler rooms had also to be made. Modified funnels and navigational aids had also to be provided before they could enter service. On the morning of 11 September 1946 the first voyage of the Atlantic Steam Navigation Company took place when Empire Baltic sailed from Tilbury to Rotterdam with a full load of 64 vehicles for the Dutch Government. On arrival at Waalhaven the vessel beached using the method employed during wartime landings, being held by a stern anchor. The vessel stayed on the beach overnight, returning at 08:00 the next morning. This leisurely pace of work was followed for the first few voyages, the beach being employed possibly due to normal port facilities being unavailable due to wartime damage. Following the Rotterdam maiden voyage, ASN used their new vessels to transfer thousands of vehicles for the Army from Tilbury to Hamburg, later moved to Antwerp in 1955.

The original three LSTs were joined in 1948 by another vessel, LST 3041, renamed Empire Doric, after the ASN were able to convince commercial operators to support the new route between Preston and the Northern Ireland port of Larne. Originally Liverpool was chosen, but opposition from other operators led to a move to Preston in Lancashire. However, special port facilities were constructed at both Preston and Larne before the new route could be opened – a wartime-built end loading ramp built by engineers during World War II at Preston, and a floating pontoon from a Mulberry harbour connected via a bridge to the quay at Larne.

The first sailing of this new route was on 21 May 1948 by Empire Cedric. After the inaugural sailing Empire Cedric continued on the Northern Ireland service, offering initially a twice-weekly service. Empire Cedric was the first vessel of the ASN fleet to hold a Passenger Certificate, and was allowed to carry fifty passengers. Thus Empire Cedric became the first vessel in the world to operate as a commercial/passenger roll-on/roll-off ferry, and the ASN became the first commercial company to offer this type of service.

Some of the first cargo on this service were two lorry-loads of 65 gas cookers each on behalf of Messrs Moffats of Blackburn, believed to be the first commercial vehicles carried in this way as freight. The Preston–Larne service continued to expand, so much so that in 1950 the service was expanded to include a service to Belfast. This service opened in 1950 and sailings out of Preston were soon increased to six or seven a week to either Belfast or Larne.

In 1954, the British Transport Commission (BTC) took over the ASN under the Labour Government's nationalization policy. In 1955 another two LSTs where chartered into the existing fleet, Empire Cymric and Empire Nordic, bringing the fleet strength to seven. The Hamburg service was terminated in 1955, and a new service was opened between Antwerp and Tilbury. The fleet of seven ships was to be split up with the usual three ships based at Tilbury and the others maintaining the Preston to Northern Ireland service.

During late 1956, the entire fleet of ASN were taken over for use in the Mediterranean during the Suez Crisis, and the drive on/drive off services were not re-established until January 1957. At this point ASN were made responsible for the management of twelve Admiralty LST (3)s brought out of reserve as a result of the Suez Crisis too late to see service.

Army service

A major task at the end of World War II was the redistribution of stores and equipment worldwide. Due to the scarcity and expense of merchant shipping it was decided in 1946 that the Royal Army Service Corps civilian fleet should take over seven LSTs from the Royal Navy. These were named after distinguished corps officers: Evan Gibb, Charles Macleod, Maxwell Brander, Snowden Smith, Humfrey Gale, Reginald Kerr, and Fredrick Glover.

The LSTs needed to comply with Board of Trade regulations, and to be brought up to merchant navy standards, which involved lengthy alterations including extra accommodation. On completion, five vessels sailed for the Middle East, and two for the Far East.

During the evacuation of Palestine, Humfrey Gale and Evan Gibb made fifteen voyages each between Haifa and Port Said lifting between them 26,000 tons of vehicles and stores.

Similar work was done worldwide until 1952 when the ships were handed over to the Atlantic Steam Navigation Company, and subsequently in 1961 to the British-India Steam Navigation Company, tasked by the War Office directly, RASC having no further concern with their administration.

Aviation training

The rapid increase in the use of helicopters in the Royal Navy in the late 1950s and 1960s required an increase in the training and support facilities ashore and afloat. Operational training for aircrew was carried out by naval air stations at Portland and Culdrose. The scrapping of some carriers and conversion of others to commando carriers in the mid-1950s left a shortage of suitable decks. This led to the ordering of RFA Engadine in 1964; however she would not be available till 1967. In the meantime it was decided to convert LST 3027 to serve as an interim training ship.

This work was carried out at Devonport Dockyard in 1964. The deck forward of the cargo hatch was cleared of all obstructions, and strengthened for helicopter use. A small deckhouse used to support the gun emplacements was retained, although no guns were fitted, and it was used by the Flight Deck Officer as a helicopter control position. Below deck, two 10,000 gallon aviation fuel tanks were installed at the fore end of the tank deck, and refuelling positions provided at the fore end of the flight deck. The tanks were sealed off by a bulkhead and the rest of the space used for stores, workshops and accommodation. Finally the bow doors were sealed, as they would no longer be needed. The flight deck was large enough for two Westland Wessex helicopters with rotors turning, or six could be parked with rotors folded. Renamed HMS Lofoten she proved extremely useful in service, and many lessons were learned that would be incorporated into Engadine.

Notable incidents

USS LST-472 sank after a kamikaze attack off Mindoro Island, Philippines on 21 December 1944.[19]

HM LST-422, while on Lend-Leased to Great Britain, sank after hitting a mine off Anzio, Italy.[20]

USS LST-480 sank after an explosion at Pearl Harbor on 21 May 1944. Wreck of LST-480 can still be seen in the West Loch.[21]

USS LST-359 while under tow by a type V tugboat, Farallon, she was hit by a torpedo and sank after breaking in two off Spain. Two crewmen were lost.[22]

USS LST-282 sank on 15 August 1944, by German glider bomb off of St. Raphael, Southern France.[23]

USS LST-314 sank on 9 June 1944, by a torpedo off the coast of Normandy.[24]

USS LST-523 hit a mine on 19 June 1944, at Utah Beach. The blast split the LST in two. She lost 94 men of the 300th Combat Engineers and 41 of her crew. [25]

USS LST-6 sank on 17 November 1944, after hitting a mine on a trip from Rouen, France, to Portland, England.[26]

USS LST-348 sank on 20 February 1944 after she was hit by a torpedo from U-410, about 22 miles from Gaeta, Italy.[27]

USS LST-467 was sunk in 1979, near the U.S. Virgin Islands to be used as an artificial reef upright and intact. She saw service in the Pacific War then was used as interisland freighter.[28]

USS LST-471 sank in a storm in 1948, she was being towed to a scrap yard. She sank off the coast of the North Carolina outer banks. She is under 15 feet deep, near the beach in Rodanthe, North Carolina.[29]

USS LST-79 sank 30 September 1943, after being hit by an aerial torpedo off the coast of Corsica. [30]

USS LST-80 sank 20 March 1945, after hitting two mines in English Channel near Ostend, Belgium.[31]

  • Modified Item: No
  • Country/Region of Manufacture: United States
  • Topic: Ships, Boats
  • Year of Issue: 1941-1950
  • Certification: Uncertified
  • Quality: Used
  • Cancellation Type: Ship Cancel
  • Grade: Ungraded
  • Country: United States
  • People & Occupations: sailor
  • Vessel: USS
  • Naval: Censored
  • Country of Manufacture: United States
  • Branch: Navy
  • Type: vessel
  • Era: WWII
  • Denomination: Free
  • Place of Origin: United States
  • Event: Naval

PicClick Insights - USS LST Crew #4721 Naval Cover 1944 Censored WWII Sailors Mail ATB Camp BRADFORD PicClick Exclusive

  •  Popularity - 2 watchers, 0.0 new watchers per day, 1,252 days for sale on eBay. Good amount watching. 0 sold, 1 available.
  •  Best Price -
  •  Seller - 28,502+ items sold. 0.1% negative feedback. Great seller with very good positive feedback and over 50 ratings.

People Also Loved PicClick Exclusive